Pitch = rise ÷ run, often written as x:12 (x units of rise per 12 units of run). Percentage = rise ÷ run × 100; angle = arctan(rise ÷ run); slope factor = √(1 + (rise ÷ run)²), which converts a horizontal measurement into the length along the roof surface.
4:12 ≈ 18.43° (33.3%, factor 1.054); 6:12 ≈ 26.57° (50%, factor 1.118); 8:12 ≈ 33.69° (66.7%, factor 1.202); 12:12 = 45° (100%, factor 1.414). For a symmetrical gable roof with an 8 m span at 6:12, rafter length = 4 m × 1.118 ≈ 4.47 m; with a 10 m roof length both slopes total about 89.44 m², or about 98.39 m² with 10% waste.
Roof area assumes a symmetrical gable roof and excludes overhangs, dormers, valleys and ridge materials. To include eaves, add both horizontal overhangs to the span and any gable overhangs to the roof length. Have structural dimensions confirmed by a qualified professional.
Hold a level against the roof or a rafter, mark 12 inches (or 1 m) horizontally, then measure straight up to the roof surface. That height is the rise; enter rise and run in the same unit.
A 6:12 pitch is about 26.57°, or a 50% slope. Other common values: 4:12 ≈ 18.43°, 8:12 ≈ 33.69° and 12:12 = 45°.
Percentage is rise ÷ run × 100, while the angle is measured between the roof surface and the horizontal. A 100% slope is 45°, not 90°.
Enter the span and roof length to get the roof area, then the coverage per bundle. The tool adds waste and rounds up the bundle count; add a price per bundle to estimate material cost.
Rise and run calculate slope without roof dimensions. Optional area estimates model a symmetrical gable roof and exclude overhangs, dormers, valleys and ridge materials. Confirm structural dimensions with a qualified professional.